Daily on-off operation sequence
updatetime: 2005-6-22 16:09:36 hits: 4 from: local network

Daily on-off operation sequence
1.UPS at the daily shut-down, is it is it control bread UPS shut-down button can close the going against the becoming device of UPS to lie to press.
UPS is in the state of the bypass at this moment, load is supplied power by the bypass by the city electricity, the battery is in the state of charging.
2.UPS when starting the machine at ordinary times , press UPS start the machine the button can start the going against the ng device of UPS .

 


twicn item congener news:
  • Several operation sequences
  • Maintain at ordinary times

  •  