The excellent strength GS-H wireless monitoring system adopts world-leading GPRS global mobile communication technology , computer network communication and data treatment technology, develop the network long-range controlling , administrative system of a set of electricity (communication , water conservancy , petrochemical industry ,etc. ) on the basis of GPRS communication system. Utilize this system, can control the temperature of all power network equipment in network coverage of GPRS long-range and wirelessly , three phases output the voltage , output load current , active power , inactive power parameter. All parameters produce the report form regularly, there is a early warning function , convey to the data processing centre through GPRS network. Measure the position where the host computer can differentiate the warning voltage transformer automatically through GIS system , start GPS vehicle administrative system to rush to repair in time.
Following to adopt main advanced technology act as a summary to system this.
1.1 GPRS mobile communication technology
1.2 GIS geographical information treatment technology

1.3 GPS- global satellite fix technology
1.4 Data treatment technology of the computer


Second, systematic structure

This system is measured three parts of terminal station to make up by the control center , GPRS digital communication network , power network . The simple block diagram of structure of system is as follows: 
                      

2.2 Excellent strength GS-H wireless monitoring system function
Whether adopt corresponding control terminal station (PNSTA-201 ) and the application software can realize the following function .
1. Electric information issue: Release three phases and output the voltage , output load current , active power , inactive power,
    Temperature of the voltage transformer , giving up equal information
2. The data are gathered : Gather the instantaneous value , mean value and extreme value of the A , B , C three-phase current , voltage of the monitoring point, instantaneous value , mean value and extreme value of the A , B , C three-phase apparent power , active power , inactive power and power factor of the monitoring point, and frequency of the electric wire netting and voltage transformer temperature
3. Check meter in the distant place: Join various kinds of electric energy volume readouts, join through the pulse of the electric energy meter , interface of figure (RS232 or RS485 ), realize that checks meter long-rangly
4. The pass is examined : The power supply quality (such as the electric current , voltage , wave in harmony , photo corner ) to a pass is analysed
5. Worthy of changing and monitoring: For working state of distribution network not whole (whether export voltage, electric current,gain merit, inactive power,etc.) go on not monitoring
6. Oppose electricity-stealing to analyse: Distribution system can realize the whole section or is it is it gather equipment to carry far to establish by stage , make up line loss monitor the network, actual loss and amount lost difference, analyse whether the circuit steals electric behaviors at any time
7. Load is predicted: Predict ahead of time the power consumption of a monitoring point with the job placement after being convenient
8. Whether small water local / electricity generation by thermal power surf the Net electric consumption is controlled , the line loss is analysed. Through monitor analysis of network to line loss , can control to each water , power consumption of thermal power station, prevent them from stealing the electricity in a large amount
9. Information sharing: The power consuming situation of every monitoring point can realize the information sharing through the network
10. Power consuming quality is monitored: Analyse through line loss gain merit , inactive power analyse , offer electric wire netting power consuming quality
11. Purchase the electricity in advance to control: Through the analysis to that load predicts , control purchasing electric consumption of the whole electric wire netting
12. Gain merit , there is no work to manage: Active power , inactive power to every monitoring point analyse , strengthen power consuming quality
13. The wave in harmony is analysed: Pass antithesis times of in harmony wave , strange times of in harmony analysis of wave (3 - 5 in harmony wave mainly ), strengthen the control on power consuming situation, improve power consuming quality

Excellent strength GS-H wireless monitoring system characteristic
? Terminal hardware , software adopt the high dependability design
? The technical indicator is superior : Voltage Electric current Measure precision of 0.2 grades
? Consistency is good
? The maintainability is good
? The low consumption is designed
? The equipment can be examined by oneself online
? The device structure is small , light , easy to construct and install , safeguard
? Multi-functional integrated design
? Can upgrade the software online ( ISP )
? The environment has a good adaptability
? The security is good
? GPRS communication system is superior


Technical parameter
The excellent strength GS-H wireless monitoring system selects the components and parts of grade of industry for use, combines the unique circuit to design, make device can adapt to - 25 - degrees Centigrade of environment temperatures change , suit in the open air installing.
1, Working range
Amount inputs the voltage: 220VAC, ≤ 10% of content of wave in harmony
The voltage inputs the range: 185~265VAC
Frequency: 47.5~52.5Hz
Specified consumption: 4W
It is tested that able to bear pressing
Assault the voltage: 6KV/2.4Μs
Worker's voltage frequently : 2KV/2min
Operating frequency: 900/1800MHz

2.Electromagnetic and compatible
The static discharges: 8KV
Electric magnetic field of radiation: IEC1000-4-3 three grades
The electricity changes group in wink fast: IEC1000-4-4 three grades
The wave is welled up and tested: IEC1000-4-5 four grades
Exchange the magnetic field: Hand in the switchyard magnetic field in level / vertical 0.5mT

3.Environment
Temperature: -25 degrees Centigrade- +65 degrees Centigrade, varying rate: 20 degrees Centigrade / h
Relative humidity ≤ 95%
Atmosphere pressure: 66-108Kpa

4.Structure
The outer cover adopting Fire-retardant material
Accord with one grade of demands of IP5.1 (dustproof , defends and sprays water ) of GB/T4208
Physical dimension:
? 250mm *166mm * 62 mm

5.Mechanical performance

Can bear it when the frequency range is 10-150Hz , the amplitude of displacement is 0.075mm, the acceleration of peak value is 250m/s2

6.Introduction
No. 6 is exchanged introduction : Can connect the voltage of No. three , the electric current amount of No. three
Exchange the voltage to input in amount: 220V (confirm by the mutual inductor)
Exchange the overload capacity of the voltage: 150% in succession, 200% lasts 10 seconds
Exchange the electric current to input in amount: 5A (confirm by the mutual inductor)
Exchange the overload capacity of the electric current: 4 specified value in succession, specified value of 20 times sustains one second

The switch amount of the comprehensive telemetering measurement appearance of power network is imported, exported
Smooth lotus root directly joined , light through introduction, export

7.Measure the precision
Voltage: 220V or 110V
        220V amount Cheng in 180V ---The precision between 260V is 0.2 grades
        110V amount Cheng here 60V ---The precision between 160V is 0.2 grades
Electric current: 5A, in 0A ---The precision between 5A is 0.2 grades
Electric energy: The precision is 0.2 grades
Frequency: Measure range 40Hz-60Hz. The precision is under 0.1%.
Temperature: The error is within 1oC among 0oC- +85oC.

     

 
Copyright 2005 www.ljgreat.com.cn All rights reserved.